Hebei Dehuike Pump Industry Co., Ltd. is one of the most reliable manufacturers and suppliers of vertical long shaft slurry pump in China. With abundant experience, we are committed to providing high quality customized pumps with competitive price. Welcome to wholesale bulk vertical long shaft slurry pump for sale here from our factory. Also, pricelist is available.
Installation Instructions
Proper installation directly determines the operational longevity and hydraulic stability of the Vertical Long Shaft Slurry Pump. The following field-proven installation protocol ensures correct mechanical setup and long-term vibration-free operation:
- Step 1: Foundation Preparation & Baseplate Grouting:
Prepare a reinforced concrete pedestal or structural steel grating frame at the sump deck opening, sized to accommodate the pump mounting baseplate with a minimum 25 mm clearance margin on all sides. After positioning the baseplate on shims, pour non-shrink epoxy grout beneath the base to eliminate voids and transfer static and dynamic loads uniformly into the civil structure.
- Step 2: Crane Hoisting & Column Lowering into Sump:
Using a calibrated overhead crane or mobile hoist, lift the assembled Vertical Long Shaft Slurry Pump column assembly vertically above the sump opening. Slowly lower the column pipe assembly into the pit, guiding the lower suction strainer past any interior obstructions. Ensure the mounting flange seats flat and concentric on the prepared baseplate.
- Step 3: Motor Coupling Alignment (Dual-Laser Method):
Mount the drive motor onto the bearing housing top flange. Perform precise shaft-to-shaft alignment using a dual-laser alignment tool. Adjust motor shims to achieve radial and angular misalignment within 0.05 mm. This step is critical: even slight misalignment transmits amplified vibration through the long cantilever shaft to the impeller, accelerating bearing fatigue.
- Step 4: Discharge Piping Connection & Rotation Verification:
Bolt the vertical discharge flange to the site piping system using matched-grade fasteners. Do not allow pipe weight to load the pump discharge flange; independent pipe supports must carry all line weight. Before energizing the motor, rotate the shaft by hand to confirm free rotation without binding or rubbing.

Maintenance & Care
A structured preventive maintenance program extends the service life of the Vertical Long Shaft Slurry Pump and minimizes unplanned shutdown events in continuous mining and industrial operations:
- Bearing Lubrication Schedule:
The overhead bearing assembly is lubricated with premium EP2 lithium-complex grease via external zerk fittings. Recommended regreasing interval: every 1,500 to 2,000 operating hours under normal load conditions; every 800 hours under heavy-duty or high-temperature environments. Purge old grease by introducing fresh grease until a thin ring of clean grease exits the relief port.
- Vibration & Temperature Monitoring Thresholds:
Install portable or permanently mounted vibration sensors on the bearing housing. Acceptable RMS vibration velocity: below 2.8 mm/s per ISO 10816-3 Class II. Bearing housing temperature should remain below 80°C under continuous operation. Any sustained vibration increase exceeding 4.5 mm/s or temperature rise above 95°C warrants immediate shutdown and diagnostic inspection.
- Wear Part Inspection & Replacement Intervals:
Inspect the impeller eye, volute liner, and back plate after every 4,000 to 6,000 operating hours (depending on slurry abrasiveness). Measure wall thickness with ultrasonic gauges; replace components when section thickness is reduced by 25% from the original casting dimension. Always replace shaft sleeve O-rings when reinstalling worn components.
- Sump Strainer Cleaning Protocol:
Remove and clean the lower suction strainer basket monthly (or more frequently in high-debris environments). Accumulated tramp iron, rope fibers, and oversized rocks reduce effective suction area, leading to cavitation and reduced flow output.

Client Feedback
Authentic operational feedback from international mining and industrial clients provides credible third-party verification of the Vertical Long Shaft Slurry Pump's field performance and reliability:
- Copper Concentrator Floor Sump Drainage, Antofagasta, Chile:
A copper processing plant in the Atacama Desert installed multiple Vertical Long Shaft Slurry Pump units in 2023 to replace conventional submersible pumps that failed every 3 to 4 months due to seal water contamination. After 18 months of continuous operation, the plant maintenance supervisor reported zero bearing replacements, zero shaft seal failures, and an estimated 60% reduction in sump drainage maintenance labor hours.
- Silica Sand Washing Plant, Mekong Delta, Vietnam:
A large-scale silica sand processing facility replaced their existing horizontal end-suction pumps with our vertical cantilever units for their classification settling pit drainage. The plant engineer noted that pump availability increased from 78% to 96%, and impeller life extended from 2,500 hours to over 7,000 hours due to the high-chromium A05 alloy metallurgy and double-suction hydraulic balance design.
- Coal Washery Thickener Underflow, Queensland, Australia:
A coal preparation plant deployed our vertical long shaft units in their heavy-media cyclone underflow collection sump. The shift supervisor confirmed that the pumps handled 40% solids concentration magnetite slurry at 1.5 specific gravity without clogging or motor overload, operating unattended through 12-hour night shifts with remote vibration monitoring only.
- Blast Furnace Slag Granulation Pit, Turkey:
A steel mill maintenance manager reported that the Vertical Long Shaft Slurry Pump survived a 45-day continuous operation period through a summer production campaign without any intervention, handling hot slag water at 65°C with intermittent large slag fragments passing through the open impeller without blockage.

Packaging & Delivery
Export-grade packaging and structured international logistics management ensure that every Vertical Long Shaft Slurry Pump arrives at overseas project sites in pristine, installation-ready condition:
- ISPM 15 Compliant Fumigation-Free Solid Timber Crating:
Each pump unit is packed inside a heavy-duty structural timber case constructed from 25 mm thickness phenolic plywood, fully compliant with ISPM 15 international phytosanitary standards. Internal cold-bent angle iron bracing frames secure the pump column, motor, and ancillary components against shifting during ocean transit.
- VCI Vapor Corrosion Inhibitor & Vacuum Sealing Protocol:
All machined bare-metal surfaces-including shaft journals, flange faces, and bearing bores-are coated with rust-preventive oil, then wrapped in VCI vapor-corrosion-inhibitor film and heat-sealed inside 0.2 mm polyethylene envelopes. Silica gel desiccant packs absorb residual moisture inside the sealed enclosure, protecting components during long-duration sea freight.
- Weight-Based Logistics Routing:
For emergency spare parts shipments between 50 kg and 500 kg, Air Freight provides 5 to 7 day door-to-airport delivery. For complete pump units exceeding 500 kg, Sea Freight (FCL full container load or LCL less-than-container load) offers economical 15 to 35 day transit. All shipments include standard packing lists, commercial invoices, and original bills of lading.
- International Trade Terms (FOB / CIF):
Commercial quotations are issued under FOB (Free On Board) or CIF (Cost, Insurance & Freight to Designated Destination Port) Incoterms. No specific port of departure is designated in commercial documentation, ensuring flexible routing through any available international shipping channel.

Our Team

Behind every Vertical Long Shaft Slurry Pump stands a dedicated engineering and technical support team at Hebei Dehuike Pump Industry Co., Ltd. (DHK Pump), combining decades of fluid dynamics expertise with practical mining site experience:
- Senior Hydraulic Design Engineers:
Our core engineering department includes senior hydraulic design specialists with over 15 years of individual experience in slurry pump CFD (Computational Fluid Dynamics) modeling, impeller vane profiling, and sump pit flow analysis. Each new pump configuration undergoes rigorous three-dimensional velocity field simulation before prototyping to validate hydraulic performance against design targets.
- Foundry & Metallurgy Technical Specialists:
Our foundry is supervised by certified metallurgical engineers who manage daily charge material recipes, verify OES spectrometer readings, and control heat treatment quenching curves. Their expertise ensures that every batch of high-chromium alloy castings achieves consistent 58-62 HRC hardness and proper M7C3 carbide distribution.
- International Technical Sales & Service Coordinators:
Our multilingual technical desk team provides project consultation, GA drawing preparation, and after-sales troubleshooting support in English, Spanish, Russian, and Portuguese. This team operates a 24/7 response protocol, ensuring that overseas clients receive hydraulic sizing verification, installation guidance, and spare parts quotations within 2 hours of inquiry submission.
- Field Commissioning & Installation Supervisors:
For major EPC projects requiring on-site commissioning, DHK deploys experienced installation supervisors who travel to overseas project sites to oversee baseplate grouting, laser shaft alignment, initial trial runs, and operator training handover sessions.
Our Exhibition

Active participation in major international industrial trade exhibitions enables Hebei Dehuike Pump Industry Co., Ltd. (DHK Pump) to showcase the Vertical Long Shaft Slurry Pump directly to global mining, metallurgical, and infrastructure procurement decision-makers:
- Bauma Munich, Germany (Construction & Mining Machinery):
DHK exhibited at Bauma, the world's leading construction and mining machinery trade fair held in Munich, Germany. Our booth displayed a full-scale cross-sectioned Vertical Long Shaft Slurry Pump unit, allowing visiting engineers to inspect the internal cantilever shaft architecture, double-suction impeller geometry, and grease-purged labyrinth seal arrangement first-hand.
- Expomin, Santiago, Chile (Latin American Mining):
At Expomin, the premier mining technology exhibition in Latin America held in Santiago, Chile, our technical team engaged with copper and lithium concentrator procurement managers from Peru, Chile, Argentina, and Brazil. Live hydraulic sizing consultations and slurry pump selection workshops were conducted directly at the booth.
- MiningWorld, Almaty, Kazakhstan (Central Asian Mining):
Participation in MiningWorld Central Asia in Almaty enabled direct engagement with coal mining and metallurgical plant engineers from Kazakhstan, Uzbekistan, and Kyrgyzstan, addressing specific cold-climate drainage pump requirements and EAC certification compliance questions.
- IFAT, Munich & Shanghai (Environmental Technology):
DHK presented slurry drainage pump solutions at IFAT environmental technology trade fairs, connecting with wastewater treatment plant designers, municipal engineering consultants, and industrial effluent management specialists seeking robust, seal-free pumping alternatives for aggressive sludge handling applications.
Hot Tags: vertical long shaft slurry pump, China vertical long shaft slurry pump manufacturers, suppliers, factory